The oil deposit of the XIII layer of the Ehabi field entered a late stage of development, characterized by low rates of annual oil withdrawals and high water cut. The development of the oil deposit of the XIII layer is carried out with the maintenance of reservoir pressure through focal selective flooding. During the development of the XIII layer, all types of waterflooding were applied. The main purpose of the article is to analyze the current state of development and issue recommendations for regulating the development process of the XIII layer of the Ehabi field. Analysis of the current status of the development of the XIII layer and the calculations made showed that drilling new wells to increase oil recovery is economically inexpedient due to small residual balance reserves of oil. Further development of the oil deposit is recommended to be carried out with the existing well stock.
Keywords: characteristic of the geological structure of the field; oil and gas content of horizons; current status of field development; methodology «Forecast» calculation of development indicators; calculation of fluid production and well stock; indicators of econ
Reference
Lapotnikov Andrey Gennadievich 1 THE ANALYSIS OF REGULATION OF THE PROCESS DEVELOPMENT OF XIII LAYER OF EHABI OIL FIELD // Вестник студенческой науки кафедры информационных систем и программирования. – 2018. – № 01;
URL: vsn.esrae.ru/4-20 (Date Access:
17.06.2025).